  Green Acres Tributary  
     
  The First Phase of infrastructure improvements will be the improvement of the Green Acres Tributary as follows:

The channel would be regraded to provide a larger, more sinuous channel. The channel has been designed to be a step-pool system based on the geomorphological analysis. Small riffle structures would be constructed along the runs, with pools along the bends. The channel would range from a 90-110 foot wide corridor.

Overall, the channel has been designed to improve the channel stability and function by providing a more sinuous, wide channel within a large corridor.

The expected time frame beginning construction is the 2nd quarter of 2020 and ending in the 1st quarter of 2021.
 
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
                   